black and white bed linen

Frank Becker

OnSite Service

  • Daily site coordination

  • Interface management between trades

  • Installation progress tracking

  • Safety, cleanliness and access coordination

  • Delivery acceptance and site logistics

  • Defect tracking and follow-up

  • Preparation of handovers and acceptances

  • Local reporting to project stakeholders

Technologies

  • Pallet Racks

  • Shelves

  • Mezzanines and Steel Constructions

  • Trolley- and Hanging Bag Systems

  • Carton and Box Conveyors

  • Pallet Conveyors

  • Lifts and Spiral Conveyors

  • Sorting Solutions

  • Shuttle Systems and AS/RS

  • AGVs

Experienced onsite and project management for intralogistics automation projects

25 Years of Experience
Realized all sorts of MHE Projects

Project Management OnSite or Remote

Hands On Mentality

I support system integrators, suppliers, operators and general contractors during installation, commissioning, acceptance and handover — with practical project leadership, technical understanding and reliable onsite coordination.

Controlled execution instead

of unmanaged interfaces

  • stronger onsite control

  • faster clarification of open issues

  • better coordination between suppliers and trades

  • clearer reporting

  • reduced risk of delays and claims

  • better preparation for acceptance

  • less pressure on internal project teams

  • structured handover to operations

All Kinds of Industries
  • Online Commerce

  • Retail

  • Food

  • Beverage

  • Pharmacy

Dozens of Successful Finished Projects
  • Conveyor Systems

  • Shuttle Systems

  • Sorting Systems

  • Overhead Conveyor Systems

  • Mezzanines, Racks and Shelves

Projects and Experience 1

Feel free to click on the pictures

Paris - High Throughput Distribution Center
  • 18 Months OnSite Manager for ZALANDO - Online Retailer

  • Knapp Shuttle System for 480.000 container locations

  • More than 18 km of Knapp Conveyors

  • Fully Automatic Hanging Bag System for more than 1 million bags

  • five sortation systems from different producers

Various Conveyor Installations
  • Design, Installation and Commissioning of all kinds of Conveyors

  • Slat Conveyors for Beverages

  • Spiral Conveyors

  • Belt Conveyors

Projects and Experience 2

Feel free to click on the pictures

  • Design of small Solutions with Stacker Cranes

  • Leading an Installation of a big Knapp-System in Paris

  • Dismantling of a 7.000 Container System in Panama

  • Retrofit of a Knapp Shuttle System and Transfer to Turkey

Projects with Knapp Systems
  • Panama: Dismanteling of a 7.000-container Shuttle System

  • Barcelona: Design and Installation of a pick-by-light and Outbound-System

  • Poland: Design of an Outbound System

  • Hamburg: Design and Installation of complex transport System

  • Paris: Onsite-PM of a huge Knapp Installation (total Invest on Site: 300 Mio)

  • Istanbul: Reinstallation of a 25.000-container shuttle system

  • And a lot more…

Miniload Systems

Projects and Experience 3

Feel free to click on the pictures

  • Dismanteling / Retrofit / Installation of outbound systems

  • Hamburg: Dismanteling of an existing used System

  • Poland: Reinstallation of the Hamburg System

  • Frankfurt: Installation of a used System

  • Barcelona: Installation of a Knapp System

Online Commerce in Hamburg
Projects for Nintendo
  • Logistics planning and general supplier

  • Scope of assignment

    Transformation from manual handling to semi-automated systems

  • Provided services

    Planning of warehouse- and production areas and internal material flow

    Design and construction of different transport Systems, racks, storage systems

  • Installation of 500 Meters of Conveyors

  • 4 Lifts

  • 3 Outbound Loading units

Cooperation Models

Short-Term Assignment

For audits, critical phases, project recovery, acceptance preparation or urgent onsite support.

Onsite Project Management

For installation, commissioning, ramp-up and handover phases.

Interim Project Manager

Temporary project leadership for system integrators, suppliers, operators or general contractors.

Task Force Support

For projects with delays, open issues, supplier conflicts, claim risks or unclear responsibilities.

The Operational Link

Between Office, Site and Customer

I manage the operational side of intralogistics projects

from planning and coordination

to commissioning and handover.

Contact

Email

Phone

frank.becker@hola.gmbh

+49 172 2929576

© 2026 All rights reserved

Frank Becker

HOLA Intralogistics GmbH

Ostwall 138

47798 Krefeld